Mathematics, 10.11.2019 05:31 jholland03

Suppose that the design engineering team set the specifications for length of a stamped sheet-metal part at 10 inches (d) with acceptable tolerances of ±.05 inches (usl and lsl). the average length of the products produced by the actual stamping process is 9.99 inches (m) with a standard deviation of .015 inches (s). the calculations for the cp and cpk are as follows: a. cp = (10.05-9.95)/6(.015) = .10/.09 = 1.11b. k = (10 – 9.99)/((10.05-9.95)/2) = .01/.05 = .20
c. cpk = 1.11 (1-.20) = 1.11(.8) = .88

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
What is the value of x in the diagram below?
Answers: 2
question
Mathematics, 21.06.2019 16:10
The line containing the midpoints of the legs of right triangle abc where a(-5,5), b(1, 1), and c(3, 4) are the vertices.
Answers: 3
question
Mathematics, 21.06.2019 23:30
Simplify. 3(4+4x) (type your answer in with no spaces)
Answers: 1
question
Mathematics, 22.06.2019 00:00
In a timed typing test lara typed 63 words per minute.estimate the number of words she should be able to type in half in hour show your work
Answers: 2
You know the right answer?
Suppose that the design engineering team set the specifications for length of a stamped sheet-metal...