The article "time series analysis for construction productivity experiments" (t. abdelhamid and j. everett, journal of construction engineering and management, 1999: 87-95) presents a study comparing the effectiveness of a video system that allows a crane operator to see the lifting point while operating the crane with the old system in which the operator relies on hand signals from a tagman.
three different lifts, a, b, and c, were studied.

lift a was of little difficulty.

lift b was of moderate difficulty.

lift c was of high difficulty.

each lift was performed several times, both with the new video system and with the old tagman system. the time (in seconds) required to perform each lift was recorded. the following tables present the means, standard deviations, and sample sizes.

can you conclude that the mean time to perform a lift of low difficulty is less when using the video system than when using the tagman system?

explain.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 22.06.2019 02:30
Which of the following exponentially equations is equivalent to the logarithmic equation below?
Answers: 2
question
Mathematics, 22.06.2019 06:50
What is the equation of a line, in general form, that passes through point (1, -2) and has a slope of 1/3 3x - y - 7 = 0 x - 3y + 7 = 0 x - 3y - 7 = 0
Answers: 1
question
Mathematics, 22.06.2019 07:00
In a grapefruit eating contest, sal ate 5 1/3 grapefruits in 2 minutes. if the world record is 7 1/6 grapefruits in 3 minutes, how many grapefruits would sal have had to eat in the next minute to tie the record
Answers: 1
question
Mathematics, 22.06.2019 09:00
Who is the owner of the federal reserve (consumer math)
Answers: 2
You know the right answer?
The article "time series analysis for construction productivity experiments" (t. abdelhamid and j. e...
Questions
question
Mathematics, 24.04.2020 22:59
question
Chemistry, 24.04.2020 23:00
Questions on the website: 13722361