Ajob shop scheduling problem
seven jobs (1, 2, 3, 4, 5, 6, 7) need to be processed today in a machine shop that has 4
machines (a, b, c, d). a machine can process multiple jobs. the following table provides the
processing time (hours) and processing cost ($) on each machine, as well as the number of
hours each machine is available today. for example, job 3 requires 5 hours processing time on
machine c which costs $130; the available time on machine c today is 10 hours. a"-" for the
(1.j) element means that machine i cannot process job j. find the assignments of jobs to
machines so that all jobs are processed today at minimum total cost given the availability of the
machines. solve using lingo's modeling language.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
The graph below shows the price of different numbers of mats at a store: a graph is shown. the values on the x axis are 0, 2, 4, 6, 8, 10. the values on the y axis are 0, 21, 42, 63, 84, and 105. points are shown on ordered pairs 0, 0 and 2, 21 and 4, 42 and 6, 63 and 8, 84. these points are connected by a line. the label on the x axis is number of mats. the title on the y axis is price in dollars. which equation can be used to determine p, the cost of b mats?
Answers: 3
question
Mathematics, 21.06.2019 16:20
Aclass consists of 55% boys and 45% girls. it is observed that 25% of the class are boys and scored an a on the test, and 35% of the class are girls and scored an a on the test. if a student is chosen at random and is found to be a girl, the probability that the student scored an ais
Answers: 2
question
Mathematics, 21.06.2019 18:00
Asquare has a perimeter of sixteen centimeters. what is the length of each of its sides? a. 8 cm c. 9 cm b. 4 cm d. 10 cm select the best answer from the choices
Answers: 2
question
Mathematics, 21.06.2019 20:00
Could somebody me with this radical simplification?
Answers: 1
You know the right answer?
Ajob shop scheduling problem
seven jobs (1, 2, 3, 4, 5, 6, 7) need to be processed today in a m...
Questions
question
Mathematics, 28.10.2020 04:20
question
Mathematics, 28.10.2020 04:20
question
SAT, 28.10.2020 04:20
Questions on the website: 13722367