An assembly line produces 2 toasters per minute. it is 2: 00pm and the line has finished 560 out of its goal of 900 for the day. the line stops at 5: 00pm. a co-worker is urging you to stop the line for a half hour break, saying that you will make the goal anyway. should you stop the line for a half hour break?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 12:40
Find the missing factor in exponential form 48^2=3^2 • ?
Answers: 3
question
Mathematics, 21.06.2019 17:00
Convert 2000 swiss francs to dutch guilders
Answers: 1
question
Mathematics, 21.06.2019 17:30
Is trapezoid abdc the result of a dilation of trapezoid mnpq by a scale factor of ? why or why not? yes, because ab and cd are each the lengths mn and qp. yes, because sides ab and cd are parallel to sides mn and qp. no, because ab is the length mn but cd is the length qp. no, because sides ab and cd have different slopes from sides mn and qp.
Answers: 1
question
Mathematics, 21.06.2019 17:30
Which are factor pairs of 350? choose all answers that are correct. a) 30 and 12 b) 35 and 10 c) 70 and 5 d) 2 and 125
Answers: 2
You know the right answer?
An assembly line produces 2 toasters per minute. it is 2: 00pm and the line has finished 560 out of...
Questions
question
English, 09.02.2021 07:00
question
Mathematics, 09.02.2021 07:00
question
Mathematics, 09.02.2021 07:00
question
Mathematics, 09.02.2021 07:00
question
English, 09.02.2021 07:00
question
Mathematics, 09.02.2021 07:00
Questions on the website: 13722367