subject
Mathematics, 13.12.2019 18:31 donavancoulter712

A. j. has 20 jobs that she must do in sequence, with the times required to do each of these jobs being indepen-dent random variables with mean 50 minutes and standard deviation 10 minutes. m. j. has 20 jobs that he must do in sequence, with the times required to do each of these jobs being independent random variables with mean 52 min-utes and standard deviation 15 minutes.

( a) find the probability that a. j. finishes in less than 900 minutes.
( b) find the probability that m. j. finishes in less than 900 minutes.
( c) find the probability that a. j. finishes before m. j.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
The step function g(x) is defined as shown.what is the range of g(x)? ***answer choices in picture.
Answers: 3
question
Mathematics, 21.06.2019 16:30
Gail is making costumes for a school play. each rabbit costume needs one and one half yards of white fur fabric, a yard of blue striped fabric, and a quarter of a yard of pink felt for the ears. g? ail needs to make eight rabbit man yards will she need, for the white fur fabric, blue striped fabric, and pink felt?
Answers: 1
question
Mathematics, 21.06.2019 17:00
Solve 2x+y=3 x+y=5 in substitution method
Answers: 1
question
Mathematics, 21.06.2019 21:00
Which spreadsheet would be used to compute the first nine terms of the geometric sequence a^n=32•(1/2)n-1
Answers: 3
You know the right answer?
A. j. has 20 jobs that she must do in sequence, with the times required to do each of these jobs bei...
Questions
question
Spanish, 18.10.2020 16:01
question
Mathematics, 18.10.2020 16:01
question
Mathematics, 18.10.2020 16:01
question
Mathematics, 18.10.2020 16:01
Questions on the website: 13722361