Atotal of 13,000 sheet metal stampings must be produced in the press department during the next three days. manually operated presses (one operator per press) will be used to complete the job and the cycle time is 27 sec. each press must be set up with a punch-and-die set before production starts. setup time is 2.0 hr, and availability is assumed to be 100%. how many presses and operators must be devoted to this production during the three days, if there are 7.5 hr of available time per machine per day?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
Can someone me do math because i am having a breakdown rn because i don’t get it
Answers: 1
question
Mathematics, 21.06.2019 18:30
(05.08a)triangle abc is transformed to similar triangle a′b′c′ below: a coordinate plane is shown. triangle abc has vertices a at 2 comma 6, b at 2 comma 4, and c at 4 comma 4. triangle a prime b prime c prime has vertices a prime at 1 comma 3, b prime at 1 comma 2, and c prime at 2 comma 2. what is the scale factor of dilation? 1 over 2 1 over 3 1 over 4 1 over 5
Answers: 3
question
Mathematics, 21.06.2019 20:00
Landon wrote that 3−2.6=4. which statement about his answer is true?
Answers: 1
question
Mathematics, 21.06.2019 23:00
Is a square always, sometimes, or never a parallelogram
Answers: 2
You know the right answer?
Atotal of 13,000 sheet metal stampings must be produced in the press department during the next thre...
Questions
question
Mathematics, 20.07.2021 20:00
question
Mathematics, 20.07.2021 20:00
question
Physics, 20.07.2021 20:00
Questions on the website: 13722367