subject
Mathematics, 08.01.2020 08:31 ComicSans10

all the members of a construction crew work at the same pace. six of them working together are able to pour foundation in 22 hours. how many hours would this job take if the number of workers:
c
became 4 times as large

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 22.06.2019 00:00
Suppose that g(x)=f(x+9) which statement best compares the graph of g(x) with the graph of f(x)
Answers: 3
question
Mathematics, 22.06.2019 02:30
The distribution of a sample of the outside diameters of pvc pipes approximates a symmetrical, bell-shaped distribution. the arithmetic mean is 14.0 inches, and the standard deviation is 0.1 inches. about 68% of the outside diameters lie between what two amounts?
Answers: 1
question
Mathematics, 22.06.2019 03:00
Ashley spent half of her lunch money on a turkey sandwich. then she spent two-thirds of the money she had left on a bottle of juice and the rest of the money on a cookie. if the cookie cost $.75, how much lunch money did ashley have to start with?
Answers: 2
question
Mathematics, 22.06.2019 03:00
The slope of the line whose equation is 2x - 1 = 0 is
Answers: 1
You know the right answer?
all the members of a construction crew work at the same pace. six of them working together are able...
Questions
question
Mathematics, 16.10.2019 19:30
question
English, 16.10.2019 19:30
Questions on the website: 13722363