The kendal company manufactures automobile engine parts. running the manufacturing operations requires 12 watts (units of electricity per hour). the amount of electricity required to run the manufacturing operations and lighting the facility is given by y = 12x + 24, where x is the number of hours of manufacturing and y is the amount of electricity expended. how much electricity is used on a day when no parts are manufactured? (x 0, y 0). a. 2 watts. b. 12 watts. c. 20 watts. d. 24 watts . e. 30 watts.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:10
The probability that a college student belongs to a health club is 0.3. the probability that a college student lives off-campus is 0.4. the probability that a college student belongs to a health club and lives off-campus is 0.12. find the probability that a college student belongs to a health club or lives off-campus. tip: p(a or b) = p(a) + p(b) - p(a and b) 0.54 0.58 0.70 0.82
Answers: 2
question
Mathematics, 21.06.2019 17:00
The table shows population statistics for the ages of best actor and best supporting actor winners at an awards ceremony. the distributions of the ages are approximately bell-shaped. compare the z-scores for the actors in the following situation. best actor best supporting actor muequals42.0 muequals49.0 sigmaequals7.3 sigmaequals15 in a particular year, the best actor was 59 years old and the best supporting actor was 45 years old. determine the z-scores for each. best actor: z equals best supporting actor: z equals (round to two decimal places as needed.) interpret the z-scores. the best actor was (more than 2 standard deviations above more than 1 standard deviation above less than 1 standard deviation above less than 2 standard deviations below) the mean, which (is not, is) unusual. the best supporting actor was (less than 1 standard deviation below more than 1 standard deviation above more than 2 standard deviations below more than 1 standard deviation below) the mean, which (is is not) unusual.
Answers: 1
question
Mathematics, 21.06.2019 18:40
Acircle has a circumference of 28.36 units what is the diameter of the circle
Answers: 2
question
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
You know the right answer?
The kendal company manufactures automobile engine parts. running the manufacturing operations requir...
Questions
question
Social Studies, 13.12.2019 07:31
Questions on the website: 13722363