subject
Mathematics, 11.02.2020 20:48 abby4902

Future production requirements in the turret lathe department must be satisfied through the acquisition of several new machines and the hiring of new operators, the exact number to be determined. There are three new parts that will be produced. Part A has annual quantities of 20,000 units; part B, 32,000 units; and part C, 47,000 units. Corresponding standard times for these parts are 7.3 min, 4.9 min, and 8.4 min, respectively. The department will operate one 8-hour shift for 250 days/yr. The machines are expected to be 98% reliable, and the anticipated scrap rate is 4%. Worker efficiency is expected to be 100%. How many new turret lathes and operators are required to meet these production requirements?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:20
Acourgette seed and a pumpkin seed is planted p(courgette seed germinates) 4/5 and p(pumpkin seed germinates) = 1/6 what is the probability that both seds germinate
Answers: 2
question
Mathematics, 21.06.2019 18:00
Write the fraction or mixed number and the decimal shown by the model
Answers: 2
question
Mathematics, 21.06.2019 19:30
What is the effect on the graph of the function f(x)=x when f(x) is replaced with -f(x)+4
Answers: 1
question
Mathematics, 22.06.2019 00:30
A)a square brown tarp has a square green patch green in the corner the side length of the tarp is (x + 8) and the side length of the patch is x what is the area of the brown part of the tarpb)a square red placemat has a gold square in the corner the side length of the gold square is (x - 2) inches with the width of the red region is 4 in what is the area of the red part of the placemat
Answers: 2
You know the right answer?
Future production requirements in the turret lathe department must be satisfied through the acquisit...
Questions
question
History, 04.02.2021 22:50
Questions on the website: 13722363