subject
Mathematics, 12.02.2020 03:30 bellaisbored202

Three machines operating independently, simultaneously, and at the same constant rate can fill a certain production order in 36 hours. If one additional machine were used under the same operating conditions, in how many fewer hours of simultaneous operation could the production order be fulfilled?

A. 6
B. 9
C. 12
D. 27
E. 4

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
Write an equation in standard form of the line that passes through the point and has the given slope. ( -2, 4) ; m = -6which of the following best describes the technique used to graph the equation using the slope and y-intercept? y = 5x + 10write the standard form of the equation of the line through the given point with the given slope. point , 4); slope -3/2
Answers: 1
question
Mathematics, 21.06.2019 17:00
What is the difference between the points (4, 7) and (4, -5)? a. 0 units b. 2 units c. 4 units d. 12 units
Answers: 1
question
Mathematics, 22.06.2019 00:30
92ft long and 48 wide resurface 2.75$
Answers: 1
question
Mathematics, 22.06.2019 01:00
I’m not good at math can i have ? ?
Answers: 2
You know the right answer?
Three machines operating independently, simultaneously, and at the same constant rate can fill a cer...
Questions
question
Mathematics, 21.01.2021 01:30
question
History, 21.01.2021 01:30
question
Mathematics, 21.01.2021 01:30
question
Mathematics, 21.01.2021 01:30
question
Mathematics, 21.01.2021 01:30
Questions on the website: 13722360