subject
Mathematics, 20.08.2019 18:00 janetshirinyan

Paul can install a
300-square-foot hardwood floor in 18 hours. matt can install the same
floor in 22 hours. how long would it take paul and matt to install the
floor working together?
4 hours
9.9
hours
13.2 hours
30
hours

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Find the exact value of each of the following. in each case, show your work and explain the steps you take to find the value. (a) sin 17π/6 (b) tan 13π/4 (c) sec 11π/3
Answers: 2
question
Mathematics, 21.06.2019 20:50
The cost of turkey is directly proportional to its weight. if a 12-pount turkey costs $27, how much does a 16-pound turkey cost? a. $33.75 b. $36.00 c. $31.00 d. $32.50
Answers: 3
question
Mathematics, 22.06.2019 00:00
The construction of copying qpr is started below. the next step is to set the width of the compass to the length of ab. how does this step ensure that a new angle will be congruent to the original angle? by using compass take the measures of angle and draw the same arc according to it.
Answers: 1
question
Mathematics, 22.06.2019 01:00
What is 10+10+20 about the origin the square root of a triangle.
Answers: 3
You know the right answer?
Paul can install a
300-square-foot hardwood floor in 18 hours. matt can install the same
...
Questions
question
Mathematics, 20.03.2022 09:40
question
Mathematics, 20.03.2022 09:40
question
Mathematics, 20.03.2022 09:50
Questions on the website: 13722367