Mathematics, 13.02.2020 20:58 61497
A company uses three different assembly lines- A1, A2, and A3- to manufacture a particular component. Of thosemanufactured by line A1, 5% need rework to remedy a defect, whereas8% of A2's components need rework and 10% of A3's need rework. Suppose that 50% of all components are produced by Line A1, 30% areproduced by line A2, and 20% come from line A3. if a randomlyselected component needs rework, what is the probability that itcame from line A1?
Answers: 1
Mathematics, 21.06.2019 14:30
The sum of two numbers is 58. the first number is 8 less than half the second number. let c represent the first number. let drepresent the second number. which statements about solving for the two numbers are true? check all that apply.the equation  represents the sum of the two numbers.the equation  represents the sentence “the first number is 8 less than half the second number.”the equation  represents the relationship between the two numbers.the equation  represents the sum of the two numbers.the number d is 14.the number c is 44.the number c is 14.the number d is 44.
Answers: 1
Mathematics, 21.06.2019 17:30
If you apply the below transformations to the square root parent function, f(x) = vx, what is the equation of the new function? • shift 12 units right. • shift seven units down.
Answers: 1
Mathematics, 21.06.2019 22:30
Acredit union pays 5% annual interest, compounded daily, on savings deposits. find the value after one year of $500 deposited in this account. $525.64 $25.64 $20.40 $520.40
Answers: 2
A company uses three different assembly lines- A1, A2, and A3- to manufacture a particular component...
Chemistry, 13.10.2020 14:01
Mathematics, 13.10.2020 14:01
Chemistry, 13.10.2020 14:01
Mathematics, 13.10.2020 14:01
Biology, 13.10.2020 14:01
Physics, 13.10.2020 14:01
Biology, 13.10.2020 14:01
Social Studies, 13.10.2020 14:01
Mathematics, 13.10.2020 14:01
English, 13.10.2020 14:01
Mathematics, 13.10.2020 14:01