subject
Mathematics, 17.02.2020 19:34 saucyboyFredo

The Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of drilling. During the next production period, 240 hours of wiring time are available and up to 140 hours of drilling time may be used. Each air conditioner sold yields a profit of $25. Each heater assembled may be sold for a $15 profit. Formulate and solve this LP production-mix situation, and find the best combination of air conditioners and heaters that yields the highest profit.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
This is my question~~ ( r ^ 4 - 2r ^ 3 - 23 r ^ 2 - 4r - 32)÷(r+4) ~~ i must use long division to solve it : / i was wondering if anyone world like to solve it. and if so, share step-by-step explanations! you! ❤
Answers: 2
question
Mathematics, 21.06.2019 23:10
12 3 4 5 6 7 8 9 10time remaining01: 24: 54which graph represents this system? y=1/2x + 3 y= 3/2x -1
Answers: 1
question
Mathematics, 22.06.2019 02:00
Your company will replace the asphalt roofs on all the buildings at the factory complex shown below. the buildings have flat roofs. you charge according to the total roof area. what is this area, in square yards?
Answers: 3
question
Mathematics, 22.06.2019 03:00
The curved part of the figure is the semicircle what is the best approximation for the area of this figure
Answers: 3
You know the right answer?
The Attaran Corporation manufactures two electrical products: portable air conditioners and portable...
Questions
question
Medicine, 22.01.2020 06:32
question
Mathematics, 22.01.2020 06:32
question
Mathematics, 22.01.2020 06:32
Questions on the website: 13722367