Mathematics, 18.02.2020 17:49 hfroslie9840
We want to decide whether to employ a human operator or buy a machine to paint steel beams with a rust inhibitor. Steel beams are produced at a constant rate of one every 11 minutes. A skilled human operator takes an average time of 600 seconds to paint a steel beam, with a standard deviation of 30 seconds. An automatic painter takes on average 30 seconds more than the human painter to paint a beam, but with a standard deviation of only 10 seconds. Estimate the expected waiting time in queue of a steel beam for each of the operators, as well as the expected number of steel beams waiting in queue in each of the two cases. Comment on the effect of variability in service time.
Answers: 2
Mathematics, 21.06.2019 23:00
Afamily went out to dinner and their bill was $113.if they want to leave a 19% tip, how much should they leave.
Answers: 2
Mathematics, 22.06.2019 00:30
You are riding your bike and notice the square sign above. you mentally draw a straight line from point a to c. describe the angle relationship between dca and bca
Answers: 1
Mathematics, 22.06.2019 01:00
Jack is considering a list of features and fees for current bank: jack plans on using network atms about 4 times per month. what would be jack’s total estimated annual fees for a checking account with direct paycheck deposit, one overdraft per year, and no 2nd copies of statements? a. $44 b. $104 c. $144 d. $176
Answers: 3
Mathematics, 22.06.2019 01:10
If the probability of an event happening is 65% then the probability this event does not occur?
Answers: 1
We want to decide whether to employ a human operator or buy a machine to paint steel beams with a ru...
Biology, 26.04.2021 14:00
Mathematics, 26.04.2021 14:00
English, 26.04.2021 14:00
Physics, 26.04.2021 14:00
Mathematics, 26.04.2021 14:00
Health, 26.04.2021 14:00
English, 26.04.2021 14:00
Mathematics, 26.04.2021 14:00
French, 26.04.2021 14:00