subject
Mathematics, 20.02.2020 01:50 10801652

Luke is building a storage building and needs to have a slab of concrete poured. He knows the contractor charges an initial cost of $95 plus an additional $3.50 per square foot of concrete. Formulate a function that can be used to determine the cost, in dollars, to pour a concrete slab with an area of x square feet.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 20:30
Secant ac and bd intersect at point e inside f what is the measure of aed if measurements cd equals 30 a b is 50 and cb is 170
Answers: 1
question
Mathematics, 22.06.2019 01:00
In each diagram, line p is parallel to line f, and line t intersects lines p and f. based on the diagram, what is the value of x? ( provide explanation)
Answers: 1
question
Mathematics, 22.06.2019 03:30
Caitlin had 402. in her bank account.she withdrew $15.each week to pay for swimming lesson. she now has $237.
Answers: 1
question
Mathematics, 22.06.2019 03:50
Arandom sample of n = 25 observations is taken from a n(µ, σ ) population. a 95% confidence interval for µ was calculated to be (42.16, 57.84). the researcher feels that this interval is too wide. you want to reduce the interval to a width at most 12 units. a) for a confidence level of 95%, calculate the smallest sample size needed. b) for a sample size fixed at n = 25, calculate the largest confidence level 100(1 − α)% needed.
Answers: 3
You know the right answer?
Luke is building a storage building and needs to have a slab of concrete poured. He knows the contra...
Questions
question
Mathematics, 18.09.2019 02:40
Questions on the website: 13722362