16.4 A 12-station automated production line has an ideal cycle time of 24 sec. Line stops occur on average once every 20 cycles. When a line stop occurs, average downtime is 3.0 min. Cost of each starting work part is $1.55, and the cost to operate the line is $66/hr. Tooling cost is $0.13 per work part. Determine (a) average hourly production rate, (b) line efficiency, and (c) cost of a workpiece produced.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:50
(01.02 lc) angle abc has point e on ray ba and point d on ray bc. points e and d are equidistant from point b. to bisect angle abc, which of the following needs to be identified for the construction? the distance between points e and d the point in the angle that is equidistant from points e and d the endpoint of rays ba and bc the point outside of the angle that is equidistant from points e and d
Answers: 1
question
Mathematics, 21.06.2019 18:30
The length of a rectangle is x times the square root of 100. the width is one-half y more than three-halves x. given that the area of the rectangle is 125 cm2, which equation could represent the rectangle in terms of x and y? a) 5xy − 15x = 125 b) 5xy + 15x = 125 c) 15x2 − 5xy = 125 d) 15x2 + 5xy = 125
Answers: 2
question
Mathematics, 21.06.2019 22:20
Select the correct answer from each drop-down menu. the table shows the annual sales revenue for different types of automobiles from three automobile manufacturers. sales revenue (millions of dollars) suv sedan truck marginal total b & b motors 22 15 9 46 pluto cars 25 27 10 62 panther motors 26 34 12 72 marginal total 73 76 31 180 the company with the highest percentage of sales revenue from sedans is . of the annual sales revenue from suvs, the relative frequency of pluto cars is .
Answers: 1
question
Mathematics, 22.06.2019 00:00
Round each decimal to the nearest thousandth. a. 5.39562 b. 0.12345 c. 5634 d. 18.93763
Answers: 1
You know the right answer?
16.4 A 12-station automated production line has an ideal cycle time of 24 sec. Line stops occur on a...
Questions
question
Mathematics, 07.09.2021 16:50
question
English, 07.09.2021 16:50
Questions on the website: 13722361