subject
Mathematics, 21.02.2020 16:20 chrissy5189

2. In a job shop, effective capacity is only 50 percent of design capacity, and actual output is 80 percent of effective output. What design capacity would be needed to achieve an actual output of eight jobs per week

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
Given tan∅=4/3 and π< ∅< (3π)/2; find cos2∅ a. -24/25 b. 24/25 c. -24/7 d. -7/25
Answers: 1
question
Mathematics, 21.06.2019 14:00
Adriveway is 60-feet long by 6-feet wide. the length and width of the driveway will each be increased by the same number of feet. the following expression represents the perimeter of the larger driveway: (x + 60) + (x + 6) + (x + 60) + (x + 6) which expression is equivalent to the expression for the perimeter of the larger driveway? a) 2(x + 66) b) 4x + 33 c) 4(x + 33) d) 4(x + 132)
Answers: 1
question
Mathematics, 21.06.2019 15:40
The standard distance between studs in a house is 1.5 feet. if you have a set of blueprints for a house that mark every 1.5 feet with 2 in., by how many inches will a 13-foot wall be represented?
Answers: 3
question
Mathematics, 21.06.2019 16:00
Given right triangle xyz, which correctly describes the locations of the sides in relation to
Answers: 1
You know the right answer?
2. In a job shop, effective capacity is only 50 percent of design capacity, and actual output is 80...
Questions
question
Mathematics, 11.01.2021 02:20
question
English, 11.01.2021 02:20
question
Mathematics, 11.01.2021 02:20
question
English, 11.01.2021 02:20
Questions on the website: 13722362