subject
Mathematics, 21.02.2020 19:45 samaragreen34

(30 pts) The total construction cost of a sewage treatment plant with a capacity of 50 million gallons per day completed 2013 in Wichita, Kansas was $6.5 million. It was proposed that a similar treatment plant with a capacity of 80 million gallons per day be built in Los Angles, California, for completion in 2020. For the additional information given below, perform an order of magnitude estimate of the cost of the proposed plant using the following steps in order (a) to (f): a. In the total construction cost for the Wichita, Kansas plant, there was an item of $0.5 million for site preparation which is not typical for similar plants. b. The variation of sizes of the refineries can be approximated by the cost-capacity factor with m

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Sole with work in 10 years, the average number of hours of tv watched per week by teenagers dropped from 23.9 to 21.4. find the percent of change.
Answers: 1
question
Mathematics, 21.06.2019 17:30
Find and simplify an expression for the area of five rows of x squares with side lengths of x centimeters.
Answers: 3
question
Mathematics, 21.06.2019 18:00
Polygon hh is a scaled copy of polygon gg using a scale factor of 1/4. polygon h's area is what fraction of polygon g's area?
Answers: 3
question
Mathematics, 21.06.2019 19:00
Atriangle has a side lengths of 18cm, 80 cm and 81cm. classify it as acute obtuse or right?
Answers: 2
You know the right answer?
(30 pts) The total construction cost of a sewage treatment plant with a capacity of 50 million gallo...
Questions
question
Mathematics, 15.12.2020 01:00
question
English, 15.12.2020 01:00
question
Mathematics, 15.12.2020 01:00
question
Mathematics, 15.12.2020 01:00
Questions on the website: 13722367