subject
Mathematics, 25.02.2020 02:30 animaljamissofab

Frandec Company manufactures, assembles, and rebuilds materials handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four components: a frame, a motor, two supports, and a metal strap. Frandec?s production schedule calls for 5000 Liftmasters to be made next month. Frandec purchases the motors from an outside supplier, but the frames, supports, and straps may be either manufactured by the company or purchased from an outside supplier. Manufacturing and purchase costs per unit are shown.

Component

Manufacturing Cost

Purchase Cost

Frame

$38.00

$51.00

Support

$11.50

$15.00

Strap

$6.50

$7.50

Three departments are involved in the production of these components. The time (in minutes per unit) required to process each component in each department and the available capacity (in hours) for the three departments are as follows:

Department

Component

Cutting

Milling

Shaping

Frame

3.5

2.2

3.1

Support

1.3

1.7

2.6

Strap

0.8

---

1.7

Capacity (hours)

350

420

680

Formulate and solve a linear programming model for this make-or-buy application. How many of each component should be manufactured and how many should be purchased?

What is the total cost of the manufacturing and purchasing plan?

How many hours of production time are used in each department?

How much should Frandec be willing to pay for an additional hour of time in the shaping department?

Another manufacturer has offered to sell frames to Frandec for $45 each. Could Frandec improve its position by pursuing the opportunity? Why or why not?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Mickey needs to cut pieces of ribbon that are each 1 meter long tie onto balloons. if he has 8 pieces of ribbon that are each 1 dekameter long. how many 1 meter pieces of ribbon can he cut
Answers: 1
question
Mathematics, 21.06.2019 22:00
The birth weights of newborn babies in the unites states follow in a normal distrubution with a mean of 3.4 kg and standard deviation of 0.6 kg. reaserches interested in studying how. children gain weights decide to take random samples of 100 newborn babies and calculate the sample mean birth weights for each sample
Answers: 1
question
Mathematics, 21.06.2019 22:00
The sum of the speeds of two trains is 720.2 mph. if the speed of the first train is 7.8 mph faster than the second train, find the speeds of each.
Answers: 1
question
Mathematics, 22.06.2019 03:00
Find four solutions of the given function. write the solutions as ordered pairs. 4x – y = 4
Answers: 1
You know the right answer?
Frandec Company manufactures, assembles, and rebuilds materials handling equipment used in warehouse...
Questions
question
Chemistry, 05.01.2021 14:00
question
Mathematics, 05.01.2021 14:00
question
Mathematics, 05.01.2021 14:00
question
Physics, 05.01.2021 14:00
question
Mathematics, 05.01.2021 14:00
Questions on the website: 13722359