subject
Mathematics, 26.02.2020 05:18 am2334

A company manufactures two products, A and B, on two machines, I and II. It has been determined that the company will realize a profit of $5/unit of product A and $8/unit of product B. To manufacture a unit of product A requires 11 min on machine I and 7 min on machine II. To manufacture a unit of product B requires 19 min on machine I and 11 min on machine II. There are 5 hr of machine time available on machine I and 3 hr of machine time available on machine II in each work shift. How many units of each product should be produced in each shift to maximize the company's profit?1) Product A Units
2) Product B Units
3) What is the largest profit the company can realize?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
How to choose the sign of the radical in the denominator of the formula for the distance from a point to a line.
Answers: 2
question
Mathematics, 21.06.2019 18:10
Which of these sequences is a geometric sequence a 1,2,4, 7, 11, 16, 22. b. 2.4.8.14.22.38 c.3.6.9. 15.18,21 d. 3,9,27,81,243,729,
Answers: 1
question
Mathematics, 21.06.2019 22:00
What is the solution to the equation e3x=12? round your answer to the nearest hundredth
Answers: 1
question
Mathematics, 21.06.2019 22:10
What is the measure of sty in oo below? 130 310 230 50
Answers: 2
You know the right answer?
A company manufactures two products, A and B, on two machines, I and II. It has been determined that...
Questions
Questions on the website: 13722362