subject
Mathematics, 26.02.2020 20:59 aek02

Future value = P × (1+ i)t `"present value" = "P" / (1 + i)^"t"` If you save $3,000 at an interest rate of 14 percent per year, how much will you have at the end of six years? A. $5,805.96 B. $6,502.34 C. $6,584.91

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
Place the following steps in order to complete the square and solve the quadratic equation,
Answers: 1
question
Mathematics, 22.06.2019 01:30
Study results indicate that the mean length of time people spend on a bus in a city is between 21.2 min and 24.5 min what is the study margin of the error?
Answers: 1
question
Mathematics, 22.06.2019 02:00
Th perimeter of a rectangular garden is 150 feet. the length is 50 feet longer than the width, w. which equation could be used to calculate the width of the garden? a.) 2w+ 2(w-50) =150 b.) 2w+50 + 2w =150 c.) 2(w+50) + w =150 d.) 2w+ 2(w + 50) = 150 need asap. will give brainliest !
Answers: 1
question
Mathematics, 22.06.2019 02:30
Match each set of points with the quadratic function whose graph passes through those points
Answers: 1
You know the right answer?
Future value = P × (1+ i)t `"present value" = "P" / (1 + i)^"t"` If you save $3,000 at an interest r...
Questions
question
English, 16.12.2021 07:40
question
Mathematics, 16.12.2021 07:40
question
Mathematics, 16.12.2021 07:40
question
English, 16.12.2021 07:40
question
Mathematics, 16.12.2021 07:40
question
Mathematics, 16.12.2021 07:40
Questions on the website: 13722360