subject
Mathematics, 28.02.2020 05:23 live4dramaoy0yf9

A chair assembly line has 4 stations: frame, painting, padding, and packaging. A job arrives on an average every minute with a standard deviation of 4 minutes. The frame station has 8 workers, and each worker takes an average of 3 minutes to complete a frame and the standard deviation of frame making time has been found to be about 18 seconds. The painting station has 9 workers, where each worker takes an average of 4 minutes to paint and dry a frame, and the standard deviation of has been found to be about 5 minutes due to the variation in drying. The padding station is automated, with two identical machines completing the padding in exactly 54 seconds each, for every chair. The packaging station is a new, automated machine, and takes 48 seconds to pack up a chair for shipping with a variance of 21 second squared due to quality control issues. [30 points) i. How much time (in minutes) does it take from the time a job arrives at the frame making station to the time it arrives at the packaging station? a) 7.57 c) 10.58 b) 9.93 d) 25.31 ii. What is the SCV of packed chairs that are exiting the assembly line? a) 3.28 b) 13.84 c) 3.40 d) 16.00

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Ajar of gumballs contains 4 reds, 2 greens, and 6 blues. what is the probability of getting two blues in a row without replacement?
Answers: 1
question
Mathematics, 21.06.2019 19:30
Me find the value of x each figure.
Answers: 1
question
Mathematics, 21.06.2019 20:00
For what type of equity loan are you lent a lump sum, which is to be paid within a certain period of time? a. a line of credit b. equity c. a second mortgage d. an amortization
Answers: 3
question
Mathematics, 21.06.2019 21:00
The sum of the first eight terms of an arithmetic progression is 9m + 14. the fifth term of the06 progression is 2m - 6, where m is a constant.given that the first term of the progression is 26,find the value of the common difference, d and thevalue of m.
Answers: 1
You know the right answer?
A chair assembly line has 4 stations: frame, painting, padding, and packaging. A job arrives on an a...
Questions
question
Mathematics, 27.07.2019 22:10
Questions on the website: 13722362