Mathematics, 01.03.2020 20:54 finnthedino

A construction company needs to remove 4 1 6 tons of dirt from a construction site. They can remove 8 9 tons of dirt each hour. What is the total number of hours it will take to remove the dirt

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
Find the area of a square with a side length of 1/4 in.
Answers: 1
question
Mathematics, 21.06.2019 18:30
School has 204 sixth grade students. if the sixth grade is 30% of the total school, how many students are in the middle school?
Answers: 2
question
Mathematics, 21.06.2019 19:30
Suppose i pick a jelly bean at random from a box containing one red and eleven blue ones. i record the color and put the jelly bean back in the box. if i do this three times, what is the probability of getting a blue jelly bean each time? (round your answer to three decimal places.)
Answers: 1
question
Mathematics, 21.06.2019 20:10
Look at the hyperbola graphed below. the hyperbola gets very close to the red lines on the graph, but it never touches them. which term describes each of the red lines? o o o o a. asymptote b. directrix c. focus d. axis
Answers: 3
You know the right answer?
A construction company needs to remove 4 1 6 tons of dirt from a construction site. They can remove...
Questions
question
Mathematics, 20.09.2020 01:01
question
Mathematics, 20.09.2020 01:01
question
Mathematics, 20.09.2020 01:01
question
Mathematics, 20.09.2020 01:01
question
Mathematics, 20.09.2020 01:01
Questions on the website: 13722367