subject
Mathematics, 02.03.2020 20:54 aashna66

You report to your supervisor the average length of chain produced per operating hour each week. The equipment operates 5 days a week for 12 hours each day. According to last week’s production numbers shown in the table, how many feet of chain were produced per operating hour?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 22:20
The school track has eight lanes. each lane is 1.25 meters wide. the arc at each end of the track is 180. the distance of the home straight and the radii for the arcs in the 1st 4 lanes are given. s=85m r1=36.5m r2=37.75m r3=39m r4=40.25m part one: find the radii of lanes 5 through 8 of the track. show your work. part two: if max ran around lane one, how far did he run? show your work and explain your solution. part three: max wants to run a total of three laps around the track, choose two additional lanes (2-8) for him to run and find the distance around those two lanes. show your work and round to the hundredths. part 4: based on your lane choices in part three, what was the total distance max ran in the three laps around the track?
Answers: 2
question
Mathematics, 22.06.2019 00:00
The volume of the a sphere whoes diameter is 18 cm is cubic cm . if it's diameter were reduced by half, it's volume would be of its original volume
Answers: 1
question
Mathematics, 22.06.2019 02:50
2x + 3y = 17 5x + 6y = 32 usibg method if elimination
Answers: 1
question
Mathematics, 22.06.2019 03:00
Linda and ralph have signed a contract to purchase a home. the closing date is april 27, and the buyer owns the property on the day of closing. the selling price of the home is $782,500. linda and ralph obtained a fixed-rate mortgage from a bank for $685,000 at 7.35% interest. the seller has already paid $14,578.15 in property taxes for the coming year. how much will linda and ralph owe in prorated expenses? (3 points) $64,925.65 $34,347.06 $10,496.82 $9,945.06
Answers: 3
You know the right answer?
You report to your supervisor the average length of chain produced per operating hour each week. The...
Questions
question
Mathematics, 23.08.2019 11:00
Questions on the website: 13722360