subject
Mathematics, 03.03.2020 02:59 thajaalalqo

An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. The line will operate for 450 minutes per day. a. What are the minimum and maximum cycle times

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:20
What is the range of the data below? .8090100
Answers: 1
question
Mathematics, 21.06.2019 19:20
The square root of 9x plus 7 plus the square rot of 2x equall to 7
Answers: 1
question
Mathematics, 21.06.2019 21:30
Find the ratios of the corresponding sides
Answers: 2
question
Mathematics, 21.06.2019 22:00
Two numbers have a sum of -19. one number is x. what expression represents the other number?
Answers: 2
You know the right answer?
An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total tim...
Questions
question
Mathematics, 20.11.2020 18:00
question
Business, 20.11.2020 18:00
Questions on the website: 13722362