subject
Mathematics, 05.03.2020 00:48 TunaBoi

The time required to complete a project is normally distributed with a mean of 80 weeks and a standard deviation of 10 weeks. The construction company must pay a penalty if the project is not finished by the due date in the contract. If a construction company bidding on this contract wishes to be 90 percent sure of finishing by the due date, what due date (project week #) should be negotiated?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Gail is making costumes for a school play. each rabbit costume needs one and one half yards of white fur fabric, a yard of blue striped fabric, and a quarter of a yard of pink felt for the ears. g? ail needs to make eight rabbit man yards will she need, for the white fur fabric, blue striped fabric, and pink felt?
Answers: 1
question
Mathematics, 21.06.2019 17:00
Which graph corresponds to the function f(x) = x2 + 4x – 1?
Answers: 1
question
Mathematics, 21.06.2019 19:20
Ab and bc form a right angle at point b. if a= (-3,-1) and b= (4,4) what is the equation of bc?
Answers: 1
question
Mathematics, 21.06.2019 21:40
Ineed your ! i was to turn this into pond first thing i gotta do is outline the inside with this plastic how big should i cut the plastic the height: 10 1/2” the length: 40” the width: 12” me !
Answers: 1
You know the right answer?
The time required to complete a project is normally distributed with a mean of 80 weeks and a standa...
Questions
Questions on the website: 13722361