The operations manager of a body and paint shop has five cars to schedule for repair. He would like to minimize the makespan to complete all work on these cars. Each car requires body work prior to painting. The estimates of the times required to do the body and paint work on each are as follows: Car Body Work (hrs) Paint (hrs) A 10 2 B 5 4 C 7 5 D 3 6 E 1 7 What is the optimum sequence (first car to last)?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 20:30
Venita is sewing new curtains. the table below shows the relationship between the number of stitches in a row and the length ofthe row.sewingnumber of stitches length (cm)51 131532024306what is the relationship between the number of stitches and the length? othe number of stitches istimes the length.o. the number of stitches is 3 times the length.
Answers: 2
question
Mathematics, 21.06.2019 22:00
Melanie is buying a bathing suit that costs 39.99. she is given a discount at the cash register of $6.00 when she scratched 15% off on a game piece for a store promotion. what will the sale price of melanie’s bathing suit be?
Answers: 1
question
Mathematics, 22.06.2019 03:10
What is the base of the exponential expression of 4 to the power of 5
Answers: 1
question
Mathematics, 22.06.2019 03:20
Through which points should a line of rotation be placed to create a cylinder with a radius of 3 units
Answers: 2
You know the right answer?
The operations manager of a body and paint shop has five cars to schedule for repair. He would like...
Questions
question
Mathematics, 10.10.2021 14:10
question
Computers and Technology, 10.10.2021 14:10
question
Chemistry, 10.10.2021 14:10
question
Mathematics, 10.10.2021 14:10
question
Biology, 10.10.2021 14:10
question
Social Studies, 10.10.2021 14:10
question
Engineering, 10.10.2021 14:10
Questions on the website: 13722363