Mathematics, 10.03.2020 08:57 viper1325
An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. The line will operate for 450 minutes per day. Show all relevant calculations. a. What are the minimum and maximum cycle times? b. What range of output is theoretically possible for the line? c. What is the minimum number of workstations needed if the maximum output rate is to be sought? d. What cycle time will provide an output rate of 125 units per day? e. What output potential will result if the cycle time is (1) 9 minutes? (2) 15 minutes?
Answers: 3
Mathematics, 21.06.2019 13:40
Use the normal approximation to the binomial distribution to answer this question. fifteen percent of all students at a large university are absent on mondays. if a random sample of 12 names is called on a monday, what is the probability that four students are absent?
Answers: 2
Mathematics, 21.06.2019 16:00
Given a circle with measures of (c, d, and r) and a circle with measures of (c', d', and r'), what is d if c c' = 12 and d' = 0.50? a) 3 b) 6 c) 12 d) 24
Answers: 2
Mathematics, 21.06.2019 19:00
Lena reflected this figure across the x-axis. she writes the vertices of the image as a'(−2, 8), b'(−5, 6), c'(−8, 8), d'(−4, 2).
Answers: 2
Mathematics, 22.06.2019 01:00
The computer that controls a bank's automatic teller machine crashes a mean of 0.6 times per day. what is the probability that, in any seven-day week, the computer will crash less than 5 times? round your answer to four decimal places
Answers: 2
An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total tim...
Mathematics, 01.08.2019 18:30
Mathematics, 01.08.2019 18:30
History, 01.08.2019 18:30
Mathematics, 01.08.2019 18:30
English, 01.08.2019 18:30
English, 01.08.2019 18:30
Mathematics, 01.08.2019 18:30