subject
Mathematics, 20.03.2020 09:09 Yuii

A glass factory makes a continuous ribbon of glass by pouring a continuous stream of hot liquid silicon on a lake of molten tin. The liquid silicon spreads out evenly on the tin and then cools into glass. It is a process that must continue uninterrupted hours a day, so adjustments to equipment and materials are ongoing. Assume that inspectors work eight-hour shifts, watching the glass ribbon as it flows from the lake of tin, marking and counting the number of defects on the new glass. The number of defects identified by the inspectors for a -hour period is shown below

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Graph the equation by plotting point x=2
Answers: 1
question
Mathematics, 21.06.2019 16:20
Taking algebra two apex courses and need with these questions
Answers: 1
question
Mathematics, 21.06.2019 17:50
The length and width of a rectangle are consecutive even integers the area of the rectangle is 120 squares units what are the length and width of the rectangle
Answers: 1
question
Mathematics, 21.06.2019 19:00
How many real-number solutions does the equation have? -4x^2 + 10x + 6 = 0 a. no solutions b. two solutions c. infinitely many solutions d. one solution
Answers: 2
You know the right answer?
A glass factory makes a continuous ribbon of glass by pouring a continuous stream of hot liquid sili...
Questions
question
Arts, 30.10.2020 16:40
Questions on the website: 13722367