subject
Mathematics, 24.03.2020 20:57 ariyanna029

14.6.5
8
Question Help
Smith Engineering is in the process of reviewing the salaries of their surveyors. During this review, the company found that an experienced surveyor can survey a
roadbed in 5 hours. An apprentice surveyor needs 11 hours to survey the same stretch of road. If the two work together, find how long it takes them to complete the
job.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 20:10
21 type the correct answer in the box. use numerals instead of words. if necessary, use / for the fraction bar. the solution set of n2 - 14n = -45 is { (separate the solutions with a comma)
Answers: 3
question
Mathematics, 21.06.2019 23:00
In trapezoid abcd, ac is a diagonal and ∠abc≅∠acd. find ac if the lengths of the bases bc and ad are 12m and 27m respectively.
Answers: 3
question
Mathematics, 21.06.2019 23:10
Which expression is equivalent to -12(3x-3/4)
Answers: 2
question
Mathematics, 22.06.2019 00:30
The scatter plot shows the number of animal cells clara examined in a laboratory in different months: plot ordered pairs 1, 20 and 2, 60 and 3,100 and 4, 140 and 5, 180 what is the approximate predicted number of animal cells clara examined in the 9th month?
Answers: 3
You know the right answer?
14.6.5
8
Question Help
Smith Engineering is in the process of reviewing the salaries...
Questions
question
Mathematics, 03.02.2020 15:47
Questions on the website: 13722367