Mathematics, 25.03.2020 20:30 ptrlvn01

A construction company is moving rocks it takes 3/4 hours to move 12 rocks the construction company has already moved 50 of the 144 rocks that need to be moved how long in hours will it take for the construction company to move the remaining rocks

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 22:00
If abcde is reflected over the x-axis and then translated 3 units left, what are the new coordinates d? are he re
Answers: 1
question
Mathematics, 22.06.2019 00:00
The function y= x - 4x+ 5 approximates the height, y, of a bird, and its horizontal distance, x, as it flies from one fence post to another. all distances are in feet. complete the square to find and interpret the extreme value (vertex). select two answers: one extreme value and one interpretation.
Answers: 2
question
Mathematics, 22.06.2019 00:00
Aclothing designer is selecting models to walk the runway for her fashion show. the clothes she designed require each model’s height to be no more than y inches from 5 feet 10 inches, or 70 inches. which graph could be used to determine the possible variance levels that would result in an acceptable height, x?
Answers: 2
question
Mathematics, 22.06.2019 04:30
Type the correct answer in the box. use numerals instead of words. if necessary use / for the fraction bar.
Answers: 3
You know the right answer?
A construction company is moving rocks it takes 3/4 hours to move 12 rocks the construction company...