subject
Mathematics, 26.03.2020 19:11 Rach23s

There are two machines that produce aluminum cans. The newer machine can produce 4200 cans in 210 minutes. It take the older machine 280 minutes to produce that many cans. If the two machines work together, how long will it take them to produce 4200 cans?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
Arecipe calls for 2 2/4 cups of raisins, but julie only has a 1/4 measuring cup. how many 1/4 cups is needed to measure out 2 2/4 cups of raisins?
Answers: 1
question
Mathematics, 21.06.2019 19:30
What is the image of c for a 90° counterclockwise rotation about a? (3, 7) (-1, 3) (7, 3)
Answers: 1
question
Mathematics, 21.06.2019 19:30
The measure of an angle is 117°. what is the measure of a supplementary angle?
Answers: 2
question
Mathematics, 21.06.2019 22:00
The two box p digram the two box plots show the data of the pitches thrown by two pitchers throughout the season. which statement is correct? check all that apply. pitcher 1 has a symmetric data set. pitcher 1 does not have a symmetric data set. pitcher 2 has a symmetric data set. pitcher 2 does not have a symmetric data set. pitcher 2 has the greater variation.ots represent the total number of touchdowns two quarterbacks threw in 10 seasons of play
Answers: 1
You know the right answer?
There are two machines that produce aluminum cans. The newer machine can produce 4200 cans in 210 mi...
Questions
question
Mathematics, 02.08.2019 21:10
question
Mathematics, 02.08.2019 21:10
Questions on the website: 13722361