subject
Mathematics, 26.03.2020 20:04 tjmoney7709

Two methods are used to predict how many customers will call in for help in the next four days. The first method predicts the numbers of callers to be 23, 5, 14, and 20 for the four respective days. The second method predicts 20, 13, 14, and 20 for the four respective days. The actual numbers of callers turn out to be 23, 10, 15, and 19. Which method has the smaller mean squared error (MSE)?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 21:30
Which best describes the construction of a triangle if given the segment lengths of 2 cm, 3 cm, and 5 cm? a) unique triangle b) cannot be determined c) triangle not possible d) more than one triangle
Answers: 1
question
Mathematics, 21.06.2019 21:30
Rhombus adef is inscribed into a triangle abc so that they share angle a and the vertex e lies on the side bc . what is the length of the side of the rhombus if ab=c, and ac=b.
Answers: 1
question
Mathematics, 21.06.2019 23:20
This graph shows which inequality? a ≤ –3 a > –3 a ≥ –3 a < –3
Answers: 1
question
Mathematics, 22.06.2019 00:20
What is the slope of the line passing through the points (3, 3) and (5, 7) ? 1. 2 2. 1/2 3. −2 4. −1/2
Answers: 2
You know the right answer?
Two methods are used to predict how many customers will call in for help in the next four days. The...
Questions
Questions on the website: 13722360