Mathematics, 27.03.2020 00:00 leem6
If we were to continue sampling every possible sample of size The average time spent by construction workers who work on the weekends is 7.9 hours. Assume the distribution of weekend work time is approximately normal with a standard deviation of 0.8 hours.
a. Find the probability that an individual who works at that trade works fewer that 8 hours on the week- end. Now a sample of 40 construction workers is randomly selected and we wish to determine the proba- bility that the mean of the sample will be less than 8 hours.
b. Draw a normal distribution curve and shade the area corresponding to the situation.
c. Find the probability that the mean of the sample will be less than 8 hours.
Answers: 3
Mathematics, 21.06.2019 13:00
1.) 2x + y = 3 2.) x - 2y = -1 if equation 1 is multiplied by 2 and then the equations are added, the result is a.3x = 2 b.3x = 5 c.5x = 5
Answers: 1
Mathematics, 21.06.2019 17:00
Which inequality comparing two of the expressions is true when 0.7 < x < 0.9
Answers: 1
Mathematics, 21.06.2019 21:30
Find the volume of the solid obtained by rotating the region enclosed by the curves y=1x and y=7^-x about the x-axis. (use symbolic notation and fractions where needed.) volume =
Answers: 3
If we were to continue sampling every possible sample of size The average time spent by construction...
History, 13.10.2020 03:01
Health, 13.10.2020 03:01