Mathematics, 27.03.2020 00:47 mimi14564

Determine the minimum number of workers needed, and a schedule for the following staffing requirements, giving workers two consecutive days off per cycle (not including Sunday).

Day Mon Tue Wed Thu Fri Sat
Staff needed 2 3 1 2 4 3

Day Minimum Number of
Workers Needed
Mon
Tue
Wed
Thu
Fri
Sat

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Two planes leave an airport at the same time, one flying east, the other flying west. the eastbound plane travels 20 mph slower. they are 1600 mi apart after 2 hr. find the speed of each plane.
Answers: 1
question
Mathematics, 21.06.2019 20:30
Write the summation to estimate the area under the curve y = 1 + x2 from x = -1 to x = 2 using 3 rectangles and right endpoints
Answers: 1
question
Mathematics, 22.06.2019 01:00
Find the measure for the angle indicated in bold
Answers: 1
question
Mathematics, 22.06.2019 02:30
What is the area of the trapezoid shown
Answers: 1
You know the right answer?
Determine the minimum number of workers needed, and a schedule for the following staffing requiremen...
Questions
question
Mathematics, 17.06.2021 01:00
question
Mathematics, 17.06.2021 01:00
question
Physics, 17.06.2021 01:00
Questions on the website: 13722367