You have just determined the actual number of workstations that will be used on an assembly line to be 5 using the assembly-line balancing procedure. The cycle time of the line is 10 minutes and the sum of all that tasks required on the line is 25 minutes. Which of the following is the correct value for the resulting line's efficiency?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
The swimming pool is open when the high temperature is higher than 20∘c. lainey tried to swim on monday and thursday (which was 3 days later). the pool was open on monday, but it was closed on thursday. the high temperature was 30∘c on monday, but decreased at a constant rate in the next 3 days. write an inequality to determine the rate of temperature decrease in degrees celsius per day, d, from monday to thursday.
Answers: 1
question
Mathematics, 21.06.2019 20:30
What is negative 3/9 times negative 2/8 ?
Answers: 1
question
Mathematics, 21.06.2019 22:30
Micheal is 4 times as old as brandon and is also 27 years older than brandon. how old is micheal
Answers: 2
question
Mathematics, 21.06.2019 22:30
Whit h equation best represents this situation the number 98 increased by an unknown number equal to 120
Answers: 1
You know the right answer?
You have just determined the actual number of workstations that will be used on an assembly line to...
Questions
question
Mathematics, 01.06.2021 22:30
question
Mathematics, 01.06.2021 22:30
question
Mathematics, 01.06.2021 22:30
question
English, 01.06.2021 22:30
Questions on the website: 13722359