subject
Mathematics, 02.04.2020 23:32 jay9253

A construction worker needs 3 2/3 pounds of concrete mix. He has 1 1/2 pounds of concrete mix in one bag, and he has 3/10 pound of concrete mix in another bag.

How many more pounds of concrete mix does the construction worker need?

Enter your answer as a mixed number in simplest form by filling in the boxes

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 20:30
Stacey filled her 1/2 cup of measuring cup seven times to have enough flour for a cake recipe how much flour does the cake recipe calls for
Answers: 2
question
Mathematics, 22.06.2019 01:40
Which of the following is the major negative aspect of crossover designs for research studies? a. prohibitive cost b. residual effects c-subject drepout d. incomplete randomization e. large sample size required
Answers: 1
question
Mathematics, 22.06.2019 02:40
Factor the following polynomial completely 514 + 2013 - 1052 oa. 5121 + 3)( - ) ob. 51%(1 - 3)(1 + 7) oc. 5198 - 3)(x + 7) od 51%(+ 3)(x - 7)
Answers: 1
question
Mathematics, 22.06.2019 05:30
Shane and abha earned a team badge that required their team to collect no less than 2000 cans for recycling. abha collected 178 more cans than shane did. write an inequality to determine the number of cans, s, that shane could have collected.
Answers: 1
You know the right answer?
A construction worker needs 3 2/3 pounds of concrete mix. He has 1 1/2 pounds of concrete mix in one...
Questions
question
Mathematics, 13.04.2021 23:10
question
Biology, 13.04.2021 23:10
question
Mathematics, 13.04.2021 23:10
question
Mathematics, 13.04.2021 23:10
question
Mathematics, 13.04.2021 23:10
Questions on the website: 13722367