subject
Mathematics, 08.04.2020 03:13 sarinawhitaker

On average, about 96 metal sheets are delivered to the panel construction lines in 1 hour. The engineer decides to model the arrival of the metal sheets with a Poisson process. The average waiting time between arrivals in 0.62 minute. This model assumes that the waiting time between arrivals of metal sheets are independently distributed as exponential distribution. What is the probability that there is a waiting of more than 2 minutes between arrivals

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
If a and b are the measures of two first quadrant angles and sin a = 4/9 and sin b = 2/5 find sin(a+b).
Answers: 1
question
Mathematics, 21.06.2019 20:00
If the sales price of a dvd is $20 and the markup is 34%, what is the cost of the dvd?
Answers: 1
question
Mathematics, 21.06.2019 21:30
Find the ratios of the corresponding sides
Answers: 2
question
Mathematics, 21.06.2019 22:00
Asystem of linear equations with more equations than unknowns is sometimes called an overdetermined system. can such a system be consistent? illustrate your answer with a specific system of three equations in two unknowns. choose the correct answer below. a. yes, overdetermined systems can be consistent. for example, the system of equations below is consistent because it has the solution nothing. (type an ordered pair.) x 1 equals 2 comma x 2 equals 4 comma x 1 plus x 2 equals 6 b. no, overdetermined systems cannot be consistent because there are fewer free variables than equations. for example, the system of equations below has no solution. x 1 equals 2 comma x 2 equals 4 comma x 1 plus x 2 equals 12 c. yes, overdetermined systems can be consistent. for example, the system of equations below is consistent because it has the solution nothing. (type an ordered pair.) x 1 equals 2 comma x 2 equals 4 comma x 1 plus x 2 equals 8 d. no, overdetermined systems cannot be consistent because there are no free variables. for example, the system of equations below has no solution. x 1 equals 2 comma x 2 equals 4 comma x 1 plus x 2 equals 24
Answers: 3
You know the right answer?
On average, about 96 metal sheets are delivered to the panel construction lines in 1 hour. The engin...
Questions
question
Social Studies, 11.10.2019 23:50
Questions on the website: 13722363