Mathematics, 14.04.2020 19:08 happyabbie23

A roofing contractor can shingle a roof in half the time it takes his assistant. Working together, they can shingle the roof in 8 hours. How much time does it take the roofing contractor to finish the job alone

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 23:00
X-10/4 when x = –18 a 7 b –2 c –7 d 2
Answers: 1
question
Mathematics, 22.06.2019 03:10
Each side length of the hexagons is 1, what’s the area of abc
Answers: 1
question
Mathematics, 22.06.2019 05:30
You're on a residential construction team doing roofing. the pitch of a roof is 13 rise over run. find the rise if the horizontal run of the roof is 15 feet 34 inches.
Answers: 2
question
Mathematics, 22.06.2019 06:00
Amber wants to know how many blocks of each color will be needed for a tapestry on the number of 40. how many blocks of each color will she make? explain why she needs to identify a new color for this tapestry
Answers: 3
You know the right answer?
A roofing contractor can shingle a roof in half the time it takes his assistant. Working together, t...