Mathematics, 20.04.2020 20:42 20vmiller
A company has determined that when x hundred dulcimers are built, the average cost per dulcimer can be estimated by C(x)=0.3x^(2)-2.7x+7.775, where C(x) is hundreds of dollars. What is the mimimum average cst per dulcimer and how many dulcimers should be built to achieve that minimum?
Answers: 3
Mathematics, 21.06.2019 18:30
The volume of a sphere is increased by 6%. calculate the corresponding percentage increased in it area.
Answers: 3
Mathematics, 21.06.2019 20:00
Wich statement could be used to explain why the function h(x)= x^3 has an inverse relation that is also a function
Answers: 3
Mathematics, 21.06.2019 23:30
In order for the function to be linear, what must m be and why? m = 22 because the rate of change is 1. m = 20 because the rate of change is 3. m = 22 because the rate of change is -1. m = 20 because the rate of change is -3.
Answers: 2
A company has determined that when x hundred dulcimers are built, the average cost per dulcimer can...
Mathematics, 23.06.2019 10:00
Biology, 23.06.2019 10:00
English, 23.06.2019 10:00
Mathematics, 23.06.2019 10:00
History, 23.06.2019 10:00
History, 23.06.2019 10:00
Biology, 23.06.2019 10:00
Business, 23.06.2019 10:00
History, 23.06.2019 10:00
Mathematics, 23.06.2019 10:00