subject
Mathematics, 21.04.2020 00:53 anitadefrances

A manufacturing company receives orders for engines from two assembly plants. Plant I needs at least 45 engines, and plant II needs at least 32 engines. The company can send at most 140 engines to these assembly plants. It costs $35 per engine to ship to plant I and $40 per engine to ship to plant II. Plant I gives the manufacturing company $20 in rebates toward its products for each engine they buy, while plant II gives similar $15 rebates. The manufacturer estimates that they need at least $1500 in rebates to cover products they plan to buy from the two plants. How many engines should be shipped to each plant to minimize shipping costs? What is the minimum cost?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
To make a monster appear large in a movie, a human actor wore a costume and walked through a scale model of a city. the scale used was 1 inch = 15 feet. the actor is 60 inches tall. how tall does the monster appear in the movie? question 5 options: 720 feet 75 feet 4 feet 900 feet
Answers: 2
question
Mathematics, 21.06.2019 17:30
Noor brought 21 sheets of stickers. she gave 1/3 of a sheet to each of the 45 students at recess. she wants to give teachers 1 1/2 sheets each.
Answers: 2
question
Mathematics, 21.06.2019 22:40
Select the point that is a solution to the system of inequalities. y< =-x+3 y=x^(2)-3x
Answers: 3
question
Mathematics, 21.06.2019 23:30
Select the correct answer and solve for y
Answers: 2
You know the right answer?
A manufacturing company receives orders for engines from two assembly plants. Plant I needs at least...
Questions
question
Mathematics, 29.09.2019 13:10
question
Mathematics, 29.09.2019 13:10
question
Mathematics, 29.09.2019 13:10
Questions on the website: 13722363