subject
Mathematics, 23.04.2020 09:00 samueldfhung

The line plot shows the number of hours students in Mrs. Timberlake’s class worked on a project.

A line plot titled Hours Spent on Project. A number line goes from 1 to 5 and represents the number of hours. There are 3 marks above 1, 2 above 2, 5 above 3, 3 above 4, 2 above 5.

How many students are included in the data?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
Evaluate the expression. (9 + 5)(3 + 2)0
Answers: 1
question
Mathematics, 21.06.2019 20:00
The graph and table shows the relationship between y, the number of words jean has typed for her essay and x, the number of minutes she has been typing on the computer. according to the line of best fit, about how many words will jean have typed when she completes 60 minutes of typing? 2,500 2,750 3,000 3,250
Answers: 3
question
Mathematics, 21.06.2019 20:30
What is the volume of the cone to the nearest cubic millimeter? (use π  = 3.14) a) 46 mm3 b) 128 mm3 c) 183 mm3 d) 275 mm3 diameter = 5 mm height = 7 mm how do you do this problem step by step?
Answers: 1
question
Mathematics, 22.06.2019 01:00
Triangles abd and ace are similar right triangles. witch ratio best explains why the slope of ab is the same as the slope of ac?
Answers: 2
You know the right answer?
The line plot shows the number of hours students in Mrs. Timberlake’s class worked on a project.
Questions
question
Mathematics, 12.11.2019 20:31
question
Physics, 12.11.2019 20:31
question
History, 12.11.2019 20:31
Questions on the website: 13722362