A project can be completed by 8 workers in 30 days. In order to complete the project sooner, the company plans to hire additional workers. How many total workers are needed to complete the project in 16 days?
Answers: 2
Mathematics, 20.06.2019 18:04
With math question will mark brainliest question in the pic.
Answers: 3
Mathematics, 21.06.2019 17:00
What is the arc length when θ =pi over 3 and the radius is 5 cm? (5 points) 5 pi over 3 cm 10 pi over 3 cm 16 pi over 3 cm pi over 3 cm
Answers: 1
Mathematics, 21.06.2019 19:00
Graph g(x)=2cosx . use 3.14 for π . use the sine tool to graph the function. graph the function by plotting two points. the first point must be on the midline and closest to the origin. the second point must be a maximum or minimum value on the graph closest to the first point.
Answers: 1
Mathematics, 21.06.2019 20:00
The boiling point of water at an elevation of 0 feet is 212 degrees fahrenheit (°f). for every 1,000 feet of increase in elevation, the boiling point of water decreases by about 2°f. which of the following represents this relationship if b is the boiling point of water at an elevation of e thousand feet? a) e = 2b - 212 b) b = 2e - 212 c) e = -2b + 212 d) b = -2e + 212
Answers: 1
A project can be completed by 8 workers in 30 days. In order to complete the project sooner, the com...
Mathematics, 06.05.2020 08:07
Mathematics, 06.05.2020 08:08
English, 06.05.2020 08:08
Mathematics, 06.05.2020 08:08
Biology, 06.05.2020 08:08
English, 06.05.2020 08:08
Mathematics, 06.05.2020 08:08
Mathematics, 06.05.2020 08:08
Advanced Placement (AP), 06.05.2020 08:08
Mathematics, 06.05.2020 08:08
English, 06.05.2020 08:08