subject
Mathematics, 26.04.2020 05:19 RayQuan115

A quality control technician samples circuit boards and
records the number that are defective. Of 240 boards
sampled, 8 are found to be defective. The technician
reports that 30% of the boards are defective, based on the
following work:
240+8 = 30

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Give the equations of two different lines that are perpendicular to the line 3x + 4y = 7.
Answers: 1
question
Mathematics, 21.06.2019 20:00
Afootball is throw by a quarterback to a receiver
Answers: 2
question
Mathematics, 21.06.2019 22:00
Worth 100 points need the answers asap first row -x^2 2x^2 (x/2)^2 x^2 x is less than 2 x is greater than 2 x is less than or equal to 2 x is greater than or equal to 2 second row -5 -5/2 4 5 •2 is less than x& x is less than 4 •2 is less than or equal to x & x is less than or equal to 4 •2 is less than or equal to x& x is less than 4 •2 is less than x& x is less than or equal to 4
Answers: 2
question
Mathematics, 21.06.2019 22:30
The median for the given set of six ordered data values is 29.5 9 12 25 __ 41 48 what is the missing value?
Answers: 1
You know the right answer?
A quality control technician samples circuit boards and
records the number that are defective....
Questions
question
Mathematics, 12.06.2020 04:57
question
Social Studies, 12.06.2020 04:57
question
Social Studies, 12.06.2020 04:57
question
English, 12.06.2020 04:57
question
Spanish, 12.06.2020 04:57
Questions on the website: 13722361