subject
Mathematics, 06.05.2020 08:28 lilpetals

A quality-control inspector is testing a batch of printed circuit boards to see wheater they are capable of performing in a high temperature environment. He knows that the boards that will survive will pass all five of the tests with probability 98%. They will pass at least four tests with probability 99%, and they always pass at least three. On the other hand, the boards that will not survive sometimes pass the tests as well. In fact, 2% pass all five tests, and another 20% pass exactly four. The rest pass at most three tests. The inspector decides that if a board passes all five tests, he will classify it as "good." Otherwise, he'll classify it as "bad." The manager says that the probability of a type I error must be no larger than 0.01.

a. What does a type II error mean here?
b. What is the probability of a type II error?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
The table below represents a linear function f(x) and the equation represents a function g(x): x f(x) −1 −5 0 −1 1 3 g(x) g(x) = 2x − 7 part a: write a sentence to compare the slope of the two functions and show the steps you used to determine the slope of f(x) and g(x). (6 points) part b: which function has a greater y-intercept? justify your answer. (4 points)
Answers: 3
question
Mathematics, 21.06.2019 18:30
Iam a rectangle. my perimeter is 60 feet. how much are do i cover?
Answers: 1
question
Mathematics, 21.06.2019 18:30
Create a data set with 8 points in it that has a mean of approximately 10 and a standard deviation of approximately 1.
Answers: 1
question
Mathematics, 21.06.2019 20:30
If rt is greater than ba, which statement must be true ?
Answers: 1
You know the right answer?
A quality-control inspector is testing a batch of printed circuit boards to see wheater they are cap...
Questions
question
Mathematics, 18.10.2019 07:00
question
Mathematics, 18.10.2019 07:00
question
Social Studies, 18.10.2019 07:00
Questions on the website: 13722367