subject
Mathematics, 05.05.2020 22:16 zacharoo10

The design of a concrete mix requires 2,314 lb/yd3 of gravel having a moisture content of 3.5% and absorption of 4.2%, and 899 lb/yd3 of sand having a moisture content of 5.7% and absorption of 1.4%, and 244 lb/yd3 of free water. What is the weight of the mixing water per cubic yard that should be used at the job site?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
Astore has clearance items that have been marked down by 60%. they are having a sale, advertising an additional 55% off clearance items. what percent of the original price do you end up paying?
Answers: 1
question
Mathematics, 21.06.2019 23:30
The scatterplot represents the total fee for hours renting a bike. the line of best fit for the data is y = 6.855x + 10.215. which table shows the correct residual values for the data set?
Answers: 1
question
Mathematics, 22.06.2019 01:30
20 points for the answer. this is for real , don't put random ! a rectangle has a length of 4 centimeters and a width of 7 centimeters. what is the effect on the perimeter when the dimensions are multiplied by 5? the perimeter is increased by a factor of 5. the perimeter is increased by a factor of 20. the perimeter is increased by a factor of 25. the perimeter is increased by a factor of 100.
Answers: 2
question
Mathematics, 22.06.2019 03:30
Explain how you can show five less than a number using algebraic expression
Answers: 1
You know the right answer?
The design of a concrete mix requires 2,314 lb/yd3 of gravel having a moisture content of 3.5% and a...
Questions
question
Social Studies, 30.08.2019 14:00
question
Chemistry, 30.08.2019 14:00
Questions on the website: 13722367