Suppose that the minimum number of buses required during the ith hour of the day be denoted by bi (i=1,…,24). Each bus works for 6 consecutive hours. If the number of buses during the ith hour is more than bi, then a cost (Ci) incurs per hour per bus. Formulate the problem as a linear programming problem to minimize the total cost of extra buses.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
What is the perimeter of a rectangular building that is 80 feet wide and 140 feet deep?
Answers: 1
question
Mathematics, 21.06.2019 18:30
Which value would be a solution for x in the inequality 47-4x< 7
Answers: 1
question
Mathematics, 21.06.2019 23:00
The table below shows the function f. determine the value of f(3) that will lead to an average rate of change of 19 over the interval [3, 5]. a. 32 b. -32 c. 25 d. -25
Answers: 2
question
Mathematics, 22.06.2019 02:00
Aladder that is 20 ft. long against the side of a building. f the angle formed between the ladder and the ground is 75 degrees, how far is the bottom of the ladder from the base of the building?
Answers: 3
You know the right answer?
Suppose that the minimum number of buses required during the ith hour of the day be denoted by bi (i...
Questions
question
Arts, 23.03.2021 20:00
question
History, 23.03.2021 20:00
question
Advanced Placement (AP), 23.03.2021 20:00
question
Geography, 23.03.2021 20:00
question
Physics, 23.03.2021 20:00
Questions on the website: 13722360