subject
Mathematics, 29.01.2020 02:43 emilyturchon

What is the average of the following numbers: 18, 64, 23, 78, 82, 91

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 22:00
Asystem of linear equations with more equations than unknowns is sometimes called an overdetermined system. can such a system be consistent? illustrate your answer with a specific system of three equations in two unknowns. choose the correct answer below. a. yes, overdetermined systems can be consistent. for example, the system of equations below is consistent because it has the solution nothing. (type an ordered pair.) x 1 equals 2 comma x 2 equals 4 comma x 1 plus x 2 equals 6 b. no, overdetermined systems cannot be consistent because there are fewer free variables than equations. for example, the system of equations below has no solution. x 1 equals 2 comma x 2 equals 4 comma x 1 plus x 2 equals 12 c. yes, overdetermined systems can be consistent. for example, the system of equations below is consistent because it has the solution nothing. (type an ordered pair.) x 1 equals 2 comma x 2 equals 4 comma x 1 plus x 2 equals 8 d. no, overdetermined systems cannot be consistent because there are no free variables. for example, the system of equations below has no solution. x 1 equals 2 comma x 2 equals 4 comma x 1 plus x 2 equals 24
Answers: 3
question
Mathematics, 22.06.2019 00:40
Calculate the effective quarterly compound interest rate equivalent to a 1% of monthly compound interest rate.
Answers: 3
question
Mathematics, 22.06.2019 01:00
Anew landowner is interested in constructing a fence around the perimeter of her property. her property is 1,080√30 feet wide and 500√20 feet long. what is the perimeter of the property? (recall that the perimeter is the sum of each side of a shape or boundary). a 1,580√40 feet b. 5,320√5 feet c. 3,160√20 feet d. 10,640√5 feet
Answers: 3
question
Mathematics, 22.06.2019 02:40
An oil exploration company currently has two active projects, one in asia and the other in europe. let a be the event that the asian project is successful and b be the event that the european project is successful. suppose that a and b are independent events with p(a) = 0.2 and p(b) = 0.8. (a) if the asian project is not successful, what is the probability that the european project is also not successful? (b) what is the probability that at least one of the two projects will be successful? (c) given that at least one of the two projects is successful, what is the probability that only the asian project is successful? (round your answer to three decimal places.)
Answers: 3
You know the right answer?
What is the average of the following numbers: 18, 64, 23, 78, 82, 91...
Questions
question
Social Studies, 04.07.2019 00:00
question
Mathematics, 04.07.2019 00:00
question
Mathematics, 04.07.2019 00:00
question
Mathematics, 04.07.2019 00:00
question
Social Studies, 04.07.2019 00:00
question
Mathematics, 04.07.2019 00:00
Questions on the website: 13722361