subject
Mathematics, 24.05.2020 01:58 60744

Sporting Equipment, Inc. makes two types of balls: Soccer balls and Cork balls. The making of each soccer ball and cork ball requires 3 hours and 4 hours of production time, respectively. A total of 500 production hours are available during the next month At least 150 balls, combined, must be produced. The production cost for each Soccer ball is $9 and each Cork ball is $7.Formulate and solve a linear programming model minimizing production costs.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
Two fire-lookout stations are 190 miles apart, with station a directly south of station b. both stations spot a fire. the bearing of the fire from station a is upper n 55 degrees upper e and the bearing of the fire from station b is upper s 60 degrees e. how far, to the nearest tenth of a mile, is the fire from each lookout station?
Answers: 1
question
Mathematics, 21.06.2019 15:30
Fabian harvests 10 pounds of tomatoes from his garden. he needs 225 pounds to make a batch of soup. if he sets aside 2.8 pounds of tomatoes to make spaghetti sauce, how many batches of soup can fabian make?
Answers: 2
question
Mathematics, 21.06.2019 16:00
While scuba diving, rajeev dove to a depth of 12.6 feet below the surface of the water and then descended another 8.7 feet. what expression can be used to find rajeev's new position? 12.6 – 8.7 –12.6 – 8.7 –12.6 – (–8.7) 12.6 – (–8.7)
Answers: 2
question
Mathematics, 21.06.2019 16:30
What are “like terms”? why can we only add like terms?
Answers: 1
You know the right answer?
Sporting Equipment, Inc. makes two types of balls: Soccer balls and Cork balls. The making of each s...
Questions
Questions on the website: 13722361