subject
Mathematics, 29.05.2020 07:59 kekerice7350

Company 1 charges $12 per foot of fence.
Find the cost if Company 1 completes the job.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 23:00
Is there a direction u in which the rate of change of f(x,y)equals=x squared minus 3 xy plus 4 y squaredx2−3xy+4y2 at p(1,2) equals 14? give reasons for your answer. choose the correct answer below. a. no. the given rate of change is smaller than the minimum rate of change. b. no. the given rate of change is larger than the maximum rate of change. c. yes. the given rate of change is larger than the minimum rate of change and smaller than the maximum rate of change.
Answers: 2
question
Mathematics, 21.06.2019 23:00
The distance between two points is 6.5cm and scale of map is 1: 1000 what's the distance between the two points
Answers: 1
question
Mathematics, 22.06.2019 00:00
One of the complementary angles is 4 degrees mor than the other. find the angles (recall that complementary angles are angles whose sum is 90 degrees.) which of the following can not be used to solve the problem if x represents one of the angles? a. 2x-4=90 b. 2x+4=90 c. x+4=90
Answers: 1
question
Mathematics, 22.06.2019 01:30
If you were constructing a triangular frame, and you had wood in the length of 4 inches, 4 inches, and 7 inches, would it make a triangle? would you be able to create a frame from these pieces of wood?
Answers: 2
You know the right answer?
Company 1 charges $12 per foot of fence.
Find the cost if Company 1 completes the job....
Questions
question
Social Studies, 31.10.2019 22:31
question
Chemistry, 31.10.2019 22:31
question
Mathematics, 31.10.2019 22:31
question
Mathematics, 31.10.2019 22:31
Questions on the website: 13722360